The side of the building is starting to take shape with the forming of the five-foot sidewalk area outside the patio door areas.
The front of the building will have a six-foot cement area then the stone wainscotting can be done.
The area is marked for the sidewalk.
The front foyer area now has been defined with the drywall up!
More venting materials to be installed.
So much venting & ductwork!
Loads & loads of drywall has gone up this week.
Rooms are also being installed with tape & mud. Paint colours have been chosen & will soon have colour on the walls. The trim is a new contemporary style that is being done in new builds.
The venting pipes have now been covered with drywall.
The venting pipes are in the bedrooms & once painted should just blend into the room.
The drywall sheets are now out of the hall & made into a wall!
The Le Salon/Common Room is going to be the first room finished so the IKEA kitchens can be put together & installed into each kitchen.
The two two-bedroom apartments have their vents installed around the kitchen area, above the upper cupboards. So much venting, it sure is going to be a nice place to live with all the fresh air circulating through the building! And the hallway has its own ventilation system.
Nice exterior views from each window!
The back of the building has not had any of the columns or cement prep work is not done yet.
There has been a lot of inside work done this week & the following weeks will be a hive of activity too! Keep posted for the Friday reports of these weekly progressions of the Eel River Apartment.
Have a wonderful safe weekend, wherever you are!
Cynthia
No comments: