The front of Eel River Apartment has not changed much but the cement framing is being done around the side & front. We had a lot of rain today & the trees still looked beautiful with the autumn shades of red, gold, orange, & greens.
The west side of the apartment is getting framed & rebarred for the cement sidewalk.
It is going to look great when it is finished!
The east side of the apartment has the cement finished & it looks great!
The 400 amp electricity is now being brought into the electrical room.
The six-foot porch cement is going to be installed next week, can't wait to see that finishing the front!
The string of lights going down the hall will soon be replaced with a drop textured ceiling & recessed pot lights. The flooring is a patterned commercial grade tiled carpet, this is going to be a quiet noise damped down the hallway, even when you speak you can hear the difference!
The electrical room has been a hub of activity this week.
The apartment solid wood exterior apartment doors have arrived & Francis & I went over some design ideas for the interior & exterior of them. These doors are a flat solid slab that is in need of trim work on them...
The apartment interior doors have arrived too &I love the five-panel styling on the door!
The doors & trim will be painted in a soft trim white.
And the first of many doors have now been installed!
This old 102-year-old solid wooden door came from a home I lived in back in London ON. It is this door that inspired my home in Hardwicke & now the apartment door styling. It is a timeless style!
The common room/le salon is going to be a hive of construction as these IKEA boxes are opened & the kitchens begin getting the cabinet assembled.
The kitchen contractor Jeff also did the kitchen in our Hardwicke home & these cupboards are the same as the ones I have & I love them! I know the new tenants will too.
The shop is still full of materials that will be used but the mudding on the drywall has been used up quite a bit!
Once this stage is done, priming & paint colour will be next!
The one-piece toilets are waiting in the queue to be installed too but the flooring needs to be done first.
This has been a busy week again, see you next week with more photos & updates of this beautiful Eel River Apartment!
Thank you for visiting & have a great weekend!
Cynthia